ASelvax Automation

Food ProcessingFood Manufacturer

Meeting sanitary compliance without a full line replacement

The Challenge

The client's existing filling equipment used product-contact components that no longer met updated sanitary design guidelines, and a full line replacement was not in the budget before their next compliance audit.

Our Solution

We replaced the product-contact modules with stainless steel, CIP-compatible components engineered to fit the existing frame and controls, minimizing both cost and installation downtime.

Sample content for review: client name and figures on this page are placeholders — replace with the verified project details before publishing.

Results

9 days

Total installation and validation time

100%

Passed compliance audit on first review

~40%

Lower cost vs. full line replacement

Discuss a Similar Project